trench, protection from cave-in, slope of trench walls, spoil pile, competent person, 29 CFR §1926.652(a)(1), 29 CFR §1926.652(b), 29 CFR §1926.651(j)(2), 29 CFR §1926.651(k)(1)

First Published
Last Updated