Opinions

Opinions prior to 1994 have been published in four orange hard bound volumes. The orange hard bound volumes 1-4 may be found at the Review Commission Office, the N.C. Supreme Court Library and the N.C. Department of Labor Library (919-807-2850). Selected volumes available for purchase through the NCDOL Education, Training and Technical Assistance Bureau.

Search terms for Opinions

Displaying 201 - 250 of 520
Filename Keywords
2001_4009_StateUtilityContractors

underground utility construction
electrical power circuit
location of power lines
ascertain
N.C.G.S. § 95-127(18)
29 CFR § 1926.416(a)(3)

014069_SheltonPipeline

location of underground utilities
excavation
estimated location
exact location
N.C.G.S. § 87-101(3)
N.C.G.S. § 87-101(5)
29 CFR § 1926.650
29 CFR § 1926.651(b)(1)
29 CFR § 1926.651(b)(3)

2001_4005_MonroeRoadways

willful
excavation
trench
spoil pile
Class C soil
sloping
traffic control
hard hat
eye protection
ladder
N.C.G.S. § 95-127(18)
29 CFR § 1926.652(a)(1)
29 CFR § 1926.651(j)(2)
29 CFR § 1926.651(c)(2)
29 CFR § 1926.100(a)
29 CFR § 1926.21(b)(2)
29 CFR § 1926.201(a)(3)
29 CFR § 1926.201(a)(4)
29 CFR § 1926.300(c)
29 CFR § 1926.1053(b)(16)
29 CFR § 1926.1053(b)(15)

001-4005_MonroeRoadways2_FinalOrder

supplemental order
penalty calculation

2002_4127_MidSouthErectors

fatality
steel erection
safety nets
workplace greater than 25 feet above surface
29 CFR § 1926.105(a)

2002_4142_McJast

sanction
failure to appear
dismissal of notice of contest
additional penalty of $5,000.00 assessed for failure to appear

2002_4096_CarolinaBridge

bridge construction
crane
complying with manufacturer's specifications
dismissal ,29 CFR § 1926.550(a)(1)

2002_4130_YoungContracting.pdf

general contractor liability for employees of subcontractor
multiemployer worksite doctrine
competent person inspection
hard hats
protective eye wear
climbing scaffold
roofing
fall protection
29 CFR § 1926.20(b)(2)
29 CFR § 1926.100(a)
29 CFR § 1926.102(a)
29 CFR § 1926.451(e)(1)
29 CFR § 1926.501(b)(1)

2002_4192_PiedmontEMC

settlement agreement
party status
intervention
electric utility
electric shock
injured employee
Review Board Rule of Procedure .0202 and .0107

2002_4109_MasterWoodcraft

failure to appear
default
dismissal of notice of contest

2002_4187_MotsingerBlockPlant

serious
fall protection
confined space
material safety data sheet
MSDS sheet
nonserious
29 CFR § 1910.132(a)
29 CFR § 1910.146(c)(2)
29 CFR § 1910.1200(g)(1)

2002_4088_CarolinaBridgeCo

bridge demolition
fall protection
fall hazards training
engineering survey
competent person
29 C.F.R. 1926.501(b)(1)
29 C.F.R. 1926.503(a)(1)
29 C.F.R. 1926.850(a)

2002_4105_SterlingAdamsBentwood

repeat
serious
nonserious
lockout/tagout
lockout/tagout training
written emergency action plan
Radiation hazard warnings
flexible cords and cables
written hazard communication program
hazardous chemical identification and training
machine guarding
fire extinguishers
29 C.F.R. §1910.147(c)(4)(i)
29 C.F.R. §1910.147(c)(7)(i)
29 C.F.R. §1910.38(a)(1)
29 C.F.R. §1910.97(a)(3)(i)
29 C.F.R. §1910.305(g)(1)(iii)

2003_4231_TriStateUtilities

manhole
fall protection
retraining
certificate of training
29 CFR § 1926.501(b)(4)(i)
29 CFR § 1926.503(c)(3)
29 CFR § 1926.503(b)(1)

2002_4139_Britthaven

broken ground pin
accidental damage to flexible cords
opening in electrical box
serious
nonserious
29 CFR §1910.304(f)(4)
29 CFR 1910.305(a)(2)(iii)(G)
29 CFR 1910.305(b)(1)

2002_4170_DSSWainGas

serious
nonserious
opening in electrical box
missing electrical receptacle face plate
OSH 200 logs
fall protection standard railings
standard stair railings
exit signs
work rests on grinding wheels
safety guards on grinding wheels
written hazard communication program
29 CFR §1910.305(b)(2)
29 CFR §1904.2(a)
29 CFR § 1910.23(c)(1),29 CFR §1910.23(e)(1)
29 CFR § 1910.37(q)(1)
29 CFR §1910.215(a)(4)
29 CFR §1910.215(b)(9)
29 CFR §1910.1200(e)(1)

2002_4176_Virtexco

general contractor
asbestos removal
competent person
training
29 CFR § 1926.1101(o)(1)
29 CFR § 1926.1101(o)(4)(ii)

2002_4168_HamptonRoadsMechanical

representation before Board
failure to appear
default
entry of judgment
29 CFR 1926.1101(e)(1)
29 CFR 1926.1101(e)(6)
29 CFR 1926.1101(f)(2)(i)
29 CFR 1926.1101(g)(9)(iv)
29 CFR 1926.1101(k)(9)(v)
29 CFR 1926.1101(o)(1)
29 CFR 1926.1101(o)(4)(ii)

Tuttle

2003_421_McGeeBrothers

withdraw notice of contest

2003_4238_GLWilsonBuilding

roofing
low-sloped roof
fall protection
29 CFR 1926.501(b)(1)

2002_4119_PWCFayetteville

multi-employer worksite
creating employer
controlling employer
general contractor
Field Operations Manual
supervisory control
Romeo Guest
contract
dismissal
inspections by competent person
trench
spoil
29 C.F.R. 1926.20(b)(2)
29 C.F.R. 1926.651(j)(2)

2002_4156_PrimaxConstruction

general contractor
trench
failure to instruct
hard hat
ladder
egress
access
spoil pile
competent person
29 CFR §1926.652(a)(1)
29 CFR §1926.21(b)(2)
29 CFR §1926.100(a)
29 CFR §1926.651(c)(2)
29 CFR §1926.651(j)(2)
29 CFR §1926.651(k)(1)

2001_4019_SamWardFreeportGutter

settlement agreement
contempt
default
approval of settlement agreement

2002_4213_A&MElectricalFinal

fatality
electrical
serious reduced to nonserious
energized circuits
ladder capacity
29 CFR §1926.416(a)(1)
29 CFR §1926.416(a)(3)
29 CFR §1926.1053(b)(3)

2002_4109_MasterWoodcraftFinal

woodcutting shop
hazard assessment
training
machine guarding
machine anchoring
voluntary use of respirators
forklift training
forklift inspection
written hazard communication program
restroom
handtowels
lockout tagout
29 C.F.R. 1910.132(d)(2)
29 CFR 1910.132(f)(4)
29 C.F.R. 1910.212(a)(1)
29 C.F.R. 1910.212(b)
29 C.F.R. 1910.134(c)(2)(i)
29 C.F.R. 1910.178(l)(6)
29 C.F.R. 1910.178(q)(7)

2003_4295_TriadBuildersFinal

multiemployer worksite
general contractor
subcontractor
fall protection
unprotected sides and edges
controlled access zones
overhand brick laying
written alternative plan
29 CFR § 1926.501(b)(1)
29 CFR § 1926.500(b)
29 CFR § 1926.501(b)(9)
29 CFR § 1926.502(g)
29 CFR § 1926.502(k)

2003_4265_PFPlumbing

trench
protection from cave-in
spoil pile
competent person
29 CFR 1926.652(a)(1)
29 CFR 1926.651(j)(2)
29 CFR 1926.651(k)(1)

Gelbin

2002_4200_Eagle

out of business
repeat serious
NCGS 95-129(1)
29 CFR 1926.20(b)(2)
29 CFR 1926.21(b)(2)
29 CFR 1926.501(b)(13)
29 CFR 1926.503(a)(1)
29 CFR 1926.503(b)(1)

Koch

2002_4168_HamptonRoadsMechanicalFinal

asbestos
regulated areas
competent person
initial exposure assessment
impermeable drop cloths
plastic barriers
training for Class III employees
competent person training
29 CFR 1926.1101 (e)(1)
29 CFR 1926.1101 (e)(6)
29 CFR 1926.1101 (f)(2)(i)
29 CFR 1926.1101 (g)(9)(iv)
29 CFR 1926.1101 (k)(9)(v)
29 CFR 1926.1101 (o)(1) and 29 CFR 1926.1101 (o)(4)(ii)

2004_4356_DWHPainting

fatality
overloaded truck
general duty clause
instruct employees in recognition of unsafe conditions
employee misconduct
NCGS 95-129(1)
29 CFR 1926.21(b)(2)

Weaver

2004_4400_BurtSmithRoofing.pdf

roofing
residential
fall protection
scaffold
plank
extending platform
walkways and guardrails
independent contractors
repeat violation
calculation of three year time period for repeat
confidential witness
NCGS 95-126(b)(2)g
NCGS 95-136(e)(1)
29 CFR 1926.451(g)(1)
29 CFR 1926.501(b)(11)
29 CFR 1926.451(b)(1)(i)
29 CFR 1926.451(b)(5)(ii)
29 CFR 1926.451(e)(5)(i)

Gelbin

2004_4405_SteelSupply

steel erection
repeat nonserious
written notification of compression strength
masonry wall
29 CFR 1926.752(b)

Garrett

2003_4323_ThompsonContracting

electric power circuits
electric shock
deenergizing and grounding the circuits
29 CFR 1926.416(a)(1)

Weaver

2003_4275_CharlottePipeFoundry

fatality
scissor lift
lockout tagout
hazardous energy source
training
energy isolating device
stored energy
verification of isolation
electric energy
hydraulic energy
gravitational energy
29 CFR 1910.147(c)(7)(i)(A)
29 CFR1910.147(d)(3)
29 CFR 1910.147(d)(5)(i)
29 CFR 1910.147(d)(6)

Koch

2002_4151_WhelchelBuilders

asbestos
serious reduced to nonserious
competent person
initial exposure assessment
dry sweeping
Class III
wet methods
local exhaust ventilation
impermeable drop cloths
plastic barriers
respirators
protective clothing
equipment room for decontamination
work clothing cleaned with HEPA vacuum
training for Class III employees
29 CFR 1926.1101 (f)(2)(i)
29 CFR 1926.1101 (g)(3)(iii)

2003_4296_McGeeBrothers

settlement
scaffold platform
industrial truck as personnel lift
29 CFR 1926.451(b)(1)(i)
29 CFR1926.602(c)(1)(viii)(A)

Koch

2003_4304_J&SMasonry

repeat serious
scaffold platform
fall protection
toeboard
cross braces
mud sills
fire extinguisher
written hazard communication program
MSDS
material safety data sheets
training
29 CFR 1926.451(b)(1)
29 CFR 1926.451(g)(1)
29 CFR 1926.451(h)(2)
29 CFR 1926.452(c)(2)
29 CFR 1926.451(c)(2)(ii)
29 CFR 1926.150(c)(1)(i)
29 CFR 1910.1200(e)(1)
29 CFR 1910.1200(g)(8)

2004_4359_BurchetteSign

sign company
fall protection
aerial lift
body belt
lanyard
isolated incident of employee misconduct
burden of proof
29 CFR § 1910.67(c)(2)(v)
29 CFR § 1926.453(b)(2)(v)

2004_4341_AutumnCare

electrical
refrigerator
ground pin broken off
serious reduced to nonserious
NCGS 95-127(18)
29 CFR 1910.304(f)(5)(v)(C)(1)

Koch

2004_4366_Weatherguard

fatality
fall
walking/working surface
demolishing operations
engineering survey
competent person
serious
NCGS 95-127(18)
29 CFR 1926.501(a)(2)
29 CFR 1926.850(a)

Gelbin

2004_4464_Turner-Baxter

spray painting
flammable gases or vapors
Class 1
Division 1 location
unapproved work lighting
respirators, written respiratory program
medically able to use
29 CFR 1926.449(a)
29 CFR 1926.407(b)
29 CFR 1910.134(c)(2)(ii)

Koch

2004-4455 STWooten

multi-employer worksite doctrine
repeat
serious
fall protection
walking working surface
six feet
hardhats
voluntary use of respirators
N.C.G.S. 95-129(2)
29 CFR 1926.501(b)(1)
29 CFR  1926.100(a)
29 CFR  1910.134(c)(2)(i)

Peebles

2004_4382_NewBreedLeasing

jurisdiction
federal preemption
post office
mail transport equipment
29 USC 1952.155(b)(1)
Commission Rules .0512(b), .0513, and .0111
N.C.G.S. 95-152

Garrett

2004_4392_MetroUtility

fatality
willful
trench
excavation
utility contractor
working outside trench box
safety training
ladder in trench
spoil pile two feet from trench
daily inspection
competent person
cuts in web sling
N.C.G.S. 95-127(18)
29 CFR 1926.652(a)(1)
29 CFR 1926.21(b)(2)
29 CFR 1926.651(c)(2)
29 CFR 1926.651(j)(2)
29 CFR 1926.651(k)(1)
29 CFR 1926.251(e)(8)(iii)

2005_4474_MainlineContracting.pdf

excavation
trench
gas line
underground installations
29 CFR 1926.651(b)(4)
29 CFR 1926.650(b)

Weaver

2005_4523_Britthaven

bloodborne pathogen standard
hepatitis B vaccination
follow-up testing
incorporation by reference
personnel protective standard
29 CFR 1910.1030(f)(1)(ii)(D)
29 CFR 1910.132(d)(2)
29 CFR 1910.6

Koch

Appealed

2003_4249_CarolinaTiltup

fatality
failure to appear
sanctions
default
Review Commission Rule of Procedure .0503and .0309
29 CFR § 1926.21(b)(2)
29 CFR § 1926.704(a)

2006_4592_WatersConstruction

rule 60b
reasonable and prudent person
burden of proof
residential construction
willful serious
proximity to high voltage power lines

Koch

2005_4552_FayBlockMaterials

discovery
interrogatories
good cause
production of documents
N.C.G.S. 95-136(e)
N.C.G.S. 95-136(e1)
North Carolina Review Commission Rule of Procedure .0404 and .0709
United States Review Commission Rule of Procedure 2200.53 and 2200.55

Weaver

2005_4549_CarolinaStoneSetting

fall protection
precast concrete erection
leading edges
fall protection plan
resumption that it is feasible
burden of proof
29 CFR1926.501(b)(1)
29 CFR 1926.501(b)(2)
29 CFR 1926.501(b)(12)
29 CFR 1926.502(k)

Weaver