93-2876_DonohoeCompanies |
serious
floor openings
standard railing
toeboards |
95-3208_LawrenceCartner |
employer, definition of employer, leased employee, serious, nonserious, 29 CFR § 1926.451(e)(4), 1926.451(e)(10), 1926.200(h)(1)
|
94-3051_LundyPackingInterlocutory |
affected employees, union, authorized employee representative, election of party status, intervenor, N.C.G.S. § 95-137(b)(4), Review Board rule of procedure .0201, Review Board rule of procedure .0203(a), Review Board rule of procedure .0101(4),Review Board rule of procedure .0101(5), Review Board rule of procedure .0101(2)
|
93-2995_DonohoeConstructionInterlocutory |
discovery, interlocutory, witnesses, anonymity, construction, multiemployer construction site, N.C.G.S. § 95-136(e)(1), N.C.G.S. § 95-136(d)(1), N.C.G.S. § 95-136(a)(2)
|
91-2077_CityMtAiryFinalOrder |
willful, general duty clause, manhole, confined space entry, hydrogen sulfide, carbon monoxide, fatality, sewage treatment plant, N.C.G.S. § 95-138(a), N.C.G.S. § 95-129(1)
|
93-2651_FridayTemporaryServices |
employer, temporary employee, serious, employee training, built-up roofing work, N.C.G.S. § 95-127(18), 29 CFR § 1926.500(g)(6)(ii)
|
93-2729_DolesRedWhite |
fan blade guards, grounded circuits, electrical box covers, electrical cords and strain relief, fire extinguishers, junction box openings, written hazard communication program, N.C.G.S. § 95-127(18), 29 CFR § 1910.212(a)(5), 29 CFR § 1910.304(f)(4), 29 CFR § 1910.304(f)(5)(v), 29 CFR § 1910.305(b)(2),29 CFR § 1910.305(g)(2)(iii), 29 CFR § 1910.157(c)(4), 29 CFR § 1910.305(b)(1),29 CFR § 1910.1200(e)(1), 29 CFR § 1910.305(g)(1)(iii), 13 NCAC 7B.0102(a)(1),13 NCAC 7B.0306
|
94-3060_BluegrassArtCast |
opinion evidence, serious, compliance officer, breathing air-type compressor, oil-lubricated air compressor, high temperature shut-off switch, high temperature alarm, compressed air, compressed oxygen , N.C.G.S. § 95-127(18), 29 CFR § 1926.103(f)(2)(ii), 29 CFR § 1926.103(f)(1)
|
2019-6080 3rd Generation Sparks Masonry |
Garrett
motion
stipulations
withdraw
training
scaffold
daily inspection
29 CFR 1926.451
29 CFR 1926.100
Jamestown
|
2018-6052 NCDOT Safety and Risk Management Maintenance - Yadkin County |
Weaver
safety program
spokesperson
29 CFR 1910.22
29 CFR 1910.184
29 CFR 1910.305
29 CFR 1910.1200
|
2018-6009 Pallet Resource of NC, Inc. |
Garrett
Lexington
withdraw
amend
consent
29 CFR 1910.213
|
2017-5946 Robco Residential, Inc. |
Weaver
29 CFR 1926.102
29 CFR 1926.501
29 CFR 1926.1053
29 CFR 1926.20
safety meetings
spokesperson
training
document inspections
punch list
amend
consent
|
2018-5983 Marlon Mayo dba L & L Roofing |
Weaver
roofing
fall protection
repeat serious
Clemmons
general contractor
29 CFR 1926.501
|
2016-5788 Guy Turner Superior Court Order |
Guilford County
judicial review |
2018-6058 Lost Forest Development Interlocutory Order |
interlocutory
motion to dismiss
Weaver
field operations manual
written notice
letter of contest
|
2018-5999 Butterball, LLC |
amend |
2018-6058 Lost Forest Development Wake County Superior Court |
Holt
Affirm
No Error
|
2019-6113 Mante Masonry |
Wetsch
amend
minor
age
serious
Chapel Hill
29 CFR 1910.134
29 CFR 1910.1200
29 CFR 1926.55
29 CFR 1926.1153
29 CFR 1926.1203
29 CFR 1926.1205
29 CFR 1926.1207
|
93-2671_MasterWoodcraft.pdf |
penalty, penalty reduction factors, N.C.G.S. § 95-138(a)
|
93-2619_PrestigeFarm.pdf |
serious, personal protective equipment, wire mesh gloves, battery charger cover, N.C.G.S. § 95-127(18), 29 CFR § 1910.132(a), 29 CFR § 1910.305(d)
|
93-2795_ButlerTrailer.pdf |
chairman, abuse of discretion, continuance, association of out-of-state counsel, Review Board rule of procedure .0502, Review Board rule of procedure .0503 Review Board rule of procedure .0203(a)
|
93-2967_YatesConstruction.pdf |
serious, trench, excavation, ladder, cave-in, sloping, reinstatement of penalty reduced by hearing examiner, N.C.G.S. § 95-127(18), 29 CFR § 1926.652(a)(1), 29 CFR § 1926.652(b)(1)(i), 29 CFR § 1926.1053(b)(1)
|
90-1767_WeeksConstructionFinal.pdf |
exposed energized parts, willful reduced to serious, recalculation of penalty 29 CFR § 1926.950(c)(1)
|
93-2969_MastersPersonnel.pdf |
contestment, dismissal of penalty, N.C.G.S. § 95-137(b)(1)
|
90-1724_Ansco.pdf |
recalculation of penalty, willful reduced to serious, 29 CFR § 1926.651(c), 29 CFR § 1926.651(f)
|
93-2820_SumterBuilders.pdf |
discovery, protective order, review of chairman's orders, witness names, retaliation, N.C.G.S. § 95-135(c)
|
92-2443_DoverElevator.pdf |
general duty clause, elevator, installation, attachment point, multi-employer worksite, due process, recognized hazard, feasibility of abatement, N.C.G.S. § 95-129(1)
|
93-2820_SumterBuildersAffirmed.pdf |
discovery, protective order, undertaking, witness names, retaliation, N.C.G.S. § 95-136(e1), N.C.G.S. § 95-130(8), N.C.G.S. § 95-130(9), N.C.G.S. § 95-130(10), Review Board Rule of Procedure .0404(a) Review Board Rule of Procedure .0404(c)
|
03-4265_PFplumbing.pdf |
appeal, substantial evidence, entire record, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious, trench, protection from cave-in, slope of trench walls, spoil pile, competent person, 29 CFR §1926.652(a)(1), 29 CFR §1926.651(j)(2), 29 CFR §1926.651(k)(1)
|
01-4069_SheltonPipelineFinal.pdf |
location of underground utilities, excavation, estimated location, exact location, N.C.G.S. § 87-101(3), N.C.G.S. § 87-101(5), N.C.G.S. § 95-129(2), 29 CFR § 1926.650(b), 29 CFR § 1926.651(b)(1), 29 CFR § 1926.651(b)(3)
|
98-3647_CarolinaTelephoneTelegraphFinal.pdf |
telephone, telecommunications standard, appeal, substantial evidence, entire record, de novo review, 29 CFR 1910.132(a), N.C.G.S. 95-141, N.C.G.S. 150B-45
|
99-3806WeekleyHomesSuperiorCourt |
multi-employer worksite doctrine, general contractor liability for safety of employees of subcontractor, inspection of jobsite by competent person, serious, appeal, substantial evidence, entire record, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious, 29 CFR § 1926.20(b)(2), N.C.G.S. § 95-127(18), N.C.G.S. § 95-127(2), 29 U.S.C. § 654(a)(2)
|
98-3743sup_JimmyLynchSons.pdf |
error of law, substantial evidence, willful, excavation, trench, competent person, falling or rolling hazard, serious
|
96-3518sup_Dillard-Eastland-Mall.pdf |
whole record test, expert witness, possibility of an accident, PPE, personal protective equipment, safety toe shoes, standard of review of review board decision
|
93-2651_FridayTemporary.pdf |
appeal, construction standards, substantial evidence, entire record, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious, N.C.G.S. § 150B-45
|
90-1794_AssociatedMechanical.pdf |
appeal, willful, serious, trench, excavation, cave-in, fatality, slope, safety/training violation, substantial rights, whole record test, substantial evidence, entire record, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious.
|
93-2967_YatesConstructionCompany.pdf |
appeal, serious ,trench, excavation, sloping, competent person, ladder, egress from trench, upper landing surface, possibility of accident, substantial probable result, substantial evidence, whole record, reinstatement of penalty, 29 CFR 1926.652(a)(1), 29 CFR 1926.652(b)(l)(i), 29 CFR 1926.652(c), 29 CFR 1926.650, 29 CFR I926.1053(b)(1)
|
90-1794reversed_AssociatedMechanicalContractors.pdf |
appeal, willful-serious, trench, excavation, cave-in, fatality, slope, safety/training violation, de novo review, N.C.G.S. § 95-127(18), 29 C.F.R. § 1926.652(b), 29 C.F.R. § 1926.21(b)(2)
|
90-1816_NCDOTIredell.pdf |
appeal, willful-serious, trench, excavation, sloping, interlocutory, sovereign immunity, statutory immunity, personal jurisdiction, immediately appealable, notice in lieu of citation
|
90-1724appeal_Ansco.pdf |
appeal, willful, serious, trench, excavation, shoring, error of law, findings of fact do not support conclusions of law, 29 CFR 1926.651(c), 29 CFR 1926.651(f)
|
90-1794remand_AssociatedMechanical.pdf |
remand
|
95-3203appeal_StickProof.pdf |
appeal, Rule 25(a) of the Rules of Appellate Procedure, dismissal
|
94-3159appeal_LloydWilson.pdf |
appeal, substantial evidence, entire record, sole prosecutorial discretion, excess of statutory authority and jurisdiction
|
95-3203final_StickProof.pdf |
appeal, substantial evidence, entire record, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious
|
93-2967appeal_YatesConstructionCo.pdf |
appeal, substantial evidence, entire record, findings of fact, conclusions of law, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious
|
91-2074appeal_LiggettGroup.pdf |
appeal, general duty clause, whole record test, substantial evidence, entire record, findings of fact, conclusions of law, statutory right, constitutional right, excess of statutory authority, improper procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious, N.C.G.S. § 150B-45, N.C.G.S. § 95-129(1
|
90-1767appeal_WeeksConstructionCo.pdf |
appeal, willful, serious, energized line, properly isolated or insulated, de novo review, substantial right, prejudiced, conclusion of law, finding of fact, N.C.G.S. § 95-141, N.C.G.S. § 95-150B-43, N.C.G.S. § 95-150B-51(b), 29 CFR § 1926.950(c)(1)
|
86-1308_THblake.pdf |
appeal, proposed record on appeal, dismissal, Rule 11 of North Carolina Rules of Appellate Procedure
|
90-1794appeal_AssociatedMechanical.pdf |
appeal, serious, willful-serious, whole record test, de novo review, finding of fact, conclusions of law, substantial evidence, entire record, statutory right, constitutional right, excess of statutory authority, unlawful procedure, error of law, substantial competent evidence, entire record as a whole, arbitrary or capricious, N.C.G.S. § 150B-51, 29 CFR § 1926.21(b)(2), 29 CFR § 1926.652(b)
|
90-1854apeal_CarolinaCoach.pdf |
appeal, penalty reduction, penalty assessment, abuse of discretion, de novo review, N.C.G.S. § 95-138(a), N.C.G.S. § 95-137(b)(4)
|